PTT Oil and Gas (Rayong) would like to improver energy saving for lighting with LED technology in hazardous process area at GSP#1, GSP#3, Tank Farm, ESP and GSP#5. Project period was Jul 2018 to Dec 2019 (phase 1 & phase 2). Our responsibilities were as following details.
// Contract amount : 14,000,000 Baht
- Provided cable schedule and shop drawing and method statement for explosion proof equipment installation of lighting fixtures, junction box,
cables and cable raceway.
- Managed and executed project with safety management policy in hazardous area
- Supplied and Installed cables, raceway, lighting fixtures, junction boxes and termination
- Provide test & inspection plan, tested for cable and lighting fixtures and tie-in new installation fixtures to existing lighting system
- Replaced new support and hanger for fixtures
- Provided measurement report(before & after) for luminaire values
- Provided final document