43 Views |
Project Status : Ongoing
CCC-JV company has awarded the LV Switchgear/MCC as Withdrawable Fully Type Testes Design to Mahakasha company. The project period is during March 2024 to October 2024 // Contract amount : 4,600,000 Baht
Our responsibilities is as following details.
1. Provide engineering and design SLD, GA and Schematic drawings for power distribution panel.
2. Supply and install equipment and material in these panels
3. Provide testing & inspection plan, FAT and SAT procedures.
4. Provide final document and training