PTT Oil and Gas (Rayong) would like to improver energy saving for lighting with LED technology in hazardous process area at GSP#2, GSP#5, GSP#6 and GPP Substation.
Project period was Jul 2021 to Dec 2021 // Contract amount : 5,900,000 Baht
Our responsibilities are as following details.
1. Provided cable schedule, shop drawing for explosion proof equipment installation (lighting fixture, junction box) cables & raceway and grounding system.
2. Provide JSA, method statement and execute project with safety management policy in hazardous area
3. Supplied and Installed cables, raceway, lighting fixtures, junction boxes and termination
4. Replaced new support and hanger for fixtures
5. Provide testing for cable and lighting fixtures and tie-in new installation fixtures to existing lighting system
6. Provided measurement report(before & after) for luminaire values
7. Provided final document