691 Views |
Snapa was EPC’ contractor of owner : Gusco to construct for new extend production capability at existing Gusco’ RO water plant in maptaput industrial estate. Project period was Apr 2020 to Dec 2020 // Contract amount : 8,800,000 Baht
Our responsibilities are as follows;
1. Provided shop drawing, cable schedule and connection diagram for installation all equipment.
2. Supplied and installed power cables and raceway for main lv power distribution from Transformer to MDB and DB cubicles and production process
3. Supplied and installed for control panel of analyzer system
4. Supplied and installed control, instrument & communication cables and conduits from MCC and PLC cubicles & instruments
5. Supplied and installed for lighting & receptacle and grounding system.
6. Tested for cables, analyzer panels, instruments, lighting and measurement luminaire and participated for commissioning
7. Provided final document